Sunday, February 1, 2009

Last week, The new shift assembly came in so I dropped it in and bolted the FFR shifter up. I took Brandon for a quick spin around the block. Then drove downtown to meet up with Josh and pick up his new air compressor.



We came back to my place and did some body work, grinding off the fiberglass filler and doing some odd jobs on the car. Josh spread putty on the back half of the car, but sanding out the filler took a bit longer than expected so we didn't get the whole thing done. A few more aluminum pieces are in place now, like the transmission tunnel and the door sills.

Diana and I drafted out the control layout for the dash and I'm hoping to get those hooked up tomorrow.

1 comment:

Anonymous said...

yeah, i couldn't quite hold up that there camera.