Saturday, December 20, 2008

Brakes done!!! Whew.

This morning I headed over to NAPA to pick up my brake line stuff...again :-P So at long last the brakes are complete. Also, the fuel lines are connected to the fuel tank and run up to the engine bay. I ran the vapor line from the back toward the front and have mocked up where the battery cable will go. I haven't decided for sure where to mount the battery - mainly because I don't understand the instructions :-D

In preparation for the engine installation, I thought it would be a good idea to go ahead and install the heater box. Here's a pic of he box installed. So now I really do have to figure out what I'm going to do with the EGR and Smog stuff.

No comments: